`Data Center Power Metering: AC & DC Branch Circuits`

Nov 05, 2026

Application guide · AC + DC distribution

Precision power metering for data centers — down to the rack

Two distribution chains, one monitoring layer. How to sub-meter 600 A incoming feeds, ten three-phase PDU feeders and 48 rack circuits — then hand the data to the DCIM or BMS you already run.

18 min read Updated 5 November 2026 For data center owners, EPCs, switchgear builders
48circuits
sub-metered by a single DIN-rail module, in three-phase or single-phase mix
0.2class
CT accuracy on the branch circuits that feed tenant racks
−48Vdc
DC distribution measured with Hall sensors, not current transformers
3RS485 ports
on the main meter, so HMI, upstream system and sub-meters stay separate
The short answer

Measure at three points: a two-circuit meter on the dual A/B mains, a multi-circuit meter on every group of PDU feeders, and one channel per rack branch. AC branches use split- or solid-core current transformers; −48 V DC branches need Hall-effect sensors, because a CT cannot see a direct current. Every device speaks MODBUS-RTU over RS485, so it reports either into your own gateway or through an Acrel gateway over MQTT or MODBUS-TCP.

01

Why rack-level metering pays for itself

A hall full of racks and one utility bill is not a measurement — it is an average. Sub-metering turns that average into decisions, and the payback rarely comes from the energy saved first. It comes from the capacity you stop stranding.

PUE you can defend

PUE is total facility energy divided by IT energy. If the denominator is estimated from nameplate ratings or from a spreadsheet of rack counts, the number moves every time occupancy changes — and nobody trusts it. Measuring IT energy at the PDU output gives you a denominator that is metered, repeatable and auditable month after month.

Capacity you can sell

The most expensive power in a data center is the power already paid for but not delivered. Per-feeder metering shows which 32 A circuit is running at 40 % and which is at 90 %, so stranded capacity becomes visible before the next build phase is approved. The same data tells you which rack can accept another 2 kW without touching a breaker.

Billing that survives an argument

Colocation and wholesale tenants increasingly ask for consumption by rack rather than by contracted block. A measured kWh per branch, with a stated accuracy class, ends the reconciliation conversation that follows every invoice dispute.

Fault location in minutes, not walks

When a branch trips, an alarm tied to a circuit number tells the facility team which row and which PDU to look at. Without channel-level data, the same event is a walk down the hall with a clamp meter.

Reporting that starts from data

Scope 2 emissions and efficiency reporting increasingly ask for measured consumption, not modelled estimates. Monthly exports from the same meters that drive operations keep the sustainability report consistent with the bill.

Design consequence

These five drivers all point at the same architectural choice: measure close to the load, and measure every branch, not a sample. A sample tells you the average; branches tell you which one is about to trip.

02

The AC chain: where the meters go

An AC data center is fed by two independent mains so that either side can carry the hall. That redundancy is why the metering plan has to be symmetrical: what you measure on the A side, you measure on the B side, in the same place, with the same accuracy.

The chain runs from the utility incomer, through the UPS, into the main AC distribution cabinet, out to the PDUs, and finally to the IT load. Three points in that chain carry almost all of the operational value:

Point 1 — the two incomers

The first meter has an unusual job: it must watch two circuits that are never both fully loaded by design, and it must survive being the reference for everything downstream. A two-circuit three-phase meter rated for 380–456 V line-to-line does this in one device. Its six CTs go on the two incomers, and its digital input takes the breaker's on/off auxiliary contact so the system knows which side is actually carrying load.

Two details matter more than they look. First, the meter keeps three separate RS485 ports — one for the touch screen, one for the upstream system, one for the sub-metering chain — so a slow DCIM poll cannot delay the local display. Second, its digital output can drive a buzzer or a stack light directly, which means an over-current condition is visible in the room without waiting for a software alarm path.

Point 2 — the PDU feeders

Ten three-phase feeders at 32 A each is the typical shape of a medium hall: one circuit per PDU pair, three CTs per circuit. The reason to use a multi-circuit meter here rather than ten DIN-rail meters is physical. Thirty current inputs, one 35 mm rail footprint, one address, one wiring loom — versus ten devices, ten addresses and ten times the terminal work inside a cabinet that is already tight.

Point 3 — the rack branches

Forty-eight single-phase branches at 220–264 V line-to-neutral, one CT per branch, is where the tenant-level data comes from. This is also the tier where accuracy class stops being a datasheet formality: at class 0.2, a 5 % disagreement between two branches is a real difference in load, not a measurement artefact.

Acrel AMC100-FAK30 multi-circuit AC energy meter with current input terminals
AC branch tierAMC100-FAK30 — up to 10 three-phase or 30 single-phase circuits, 50 mA CT input, RS485 / MODBUS-RTU.
03

The DC chain: why −48 V needs a different sensor

Telecom halls, edge sites and many hyperscale power trains distribute at −48 Vdc. The metering logic is the same as AC — mains, feeders, branches — but the sensing physics is not, and this is where most DC monitoring designs go wrong.

AC branch sensing

Current transformer

A CT works because the current reverses direction every cycle and induces a voltage in the secondary winding. Class 0.2 accuracy, no auxiliary supply, and a secondary of 5 A or 50 mA that the meter reads directly.

Typical ratio600/5 A · 50 A/50 mA
Aperture9 mm, split or solid core
DC branch sensing

Hall-effect sensor

A direct current produces a steady flux, so there is nothing to induce. An open-loop Hall sensor measures that flux and outputs a proportional ±5 Vdc signal — but each sensor needs a ±15 Vdc auxiliary supply.

Typical ratio650 A/5 V · 100 A/5 V
AccuracyClass 1.0

The three DC metering points

The dual −48 V mains. Two incomers at 630 A DC, sourced from two independent mains so that either side can carry the hall. A two-circuit DC meter reads both through 650 A/5 V open-loop Hall sensors, and its digital inputs take the breaker status from both sides of the A/B feed.

The high-consumption racks. Twenty branches at 100 A DC, each one a 25 mm² single-core cable. A 100 A/5 V Hall sensor with a 20.5 × 10.5 mm aperture is sized for exactly this cable.

The low-consumption racks. Twenty-eight branches at 63 A DC on 16 mm² cable, sharing the same 48-channel meter as the high-consumption group. Two load classes, one module, one address — the channel map does the differentiation.

The detail that decides the panel layout

Fifty Hall sensors need fifty auxiliary supplies, which is how a neat DC metering plan turns into a power-distribution problem. A single DIN-rail module taking 35–60 Vdc in and delivering ±15 Vdc out supports up to 80 sensors — so the sensor count, not the meter count, sets the power budget.

Acrel AMC100-ZD two-channel DC energy meter for −48 Vdc distribution
DC main tierAMC100-ZD — two DC circuits at −48 Vdc, ±5 V Hall input, three RS485 ports, four digital outputs and eight digital inputs.
04

The device set, AC and DC side by side

Six device families cover both distribution chains. What changes between AC and DC is the current input and the voltage rating; what stays the same is the communications layer, which is why one platform can host both.

Model Role Capacity Electrical Comms
AMC100-ZA AC main incomer 2 × three-phase circuits 380–456 V L-L, 5 A CT input 3 × RS485, MODBUS-RTU; Ethernet optional
AMC100-FAK30 AC PDU feeders 10 × three-phase / 30 × single-phase 380–456 V L-L, 50 mA CT input 1 × RS485, MODBUS-RTU
AMC100-FAK48 AC rack branches 16 × three-phase / 48 × single-phase 380–456 V L-L, 50 mA CT input 1 × RS485, MODBUS-RTU
AMC100-ZD DC main incomer 2 × DC circuits −48 Vdc, ±5 V Hall input 3 × RS485, MODBUS-RTU; Ethernet optional
AMC100-FDK48 DC rack branches 48 × DC circuits −48 Vdc, ±5 V Hall input 1 × RS485, MODBUS-RTU
ATP007kT Local display & alarm All AMC100 meters on the bus 7-inch touch, 24 Vdc aux 2 × RS485, MODBUS-RTU
AWT200-1E4S IoT gateway 4 × RS485 downstream 85–265 Vac/Vdc 4G / WiFi / Ethernet, MQTT & MODBUS-TCP

Capacity and electrical data as published in the AC and DC data center solution guides, 2024 revisions. Both meter families carry IEC and CE declarations.

The accessories that make or break the install

Current transformers. The 50 A/50 mA split-core CT used on branch circuits comes in A and B arrangements — the same core with different front/back geometry — so that three CTs stack neatly behind a general-purpose breaker instead of fighting for space. A 9 mm aperture covers the usual 1-core 6 mm² branch cable; larger cables need the next aperture size up.

Hall sensors. Two ratings cover most DC halls: 650 A/5 V for the incomers and 100 A/5 V for the 100 A branches. Both are open-loop, class 1.0, with ±15 Vdc auxiliary supply.

Power supply module. One module feeds up to 80 Hall sensors from a 35–60 Vdc input. In a 50-sensor hall this replaces 50 individual adaptors and their 50 points of failure.

Acrel AKH-0.66/W-9A and W-9B split-core current transformers in A and B arrangement
AccessoryAKH-0.66/W-9A and W-9B, 50 A/50 mA, class 0.2. The A and B versions let three CTs sit behind one breaker without stacking conflicts.
Acrel AMC100-FDK48 48-channel DC energy meter for minus 48 Vdc rack branches
DC branch tierAMC100-FDK48 — 48 DC circuits at −48 Vdc, ±5 V Hall input, one RS485 port. The DC counterpart of the 48-channel AC module.
05

A worked deployment: 60 circuits on one cabinet

Numbers turn a concept into a bill of materials. This is the reference layout used in the AC solution guide: two 600 A incomers, ten 32 A three-phase PDU feeds, and 48 single-phase rack branches.

The scenario

  • Two three-phase incomers from independent mains — rated 3 × 600 A, 380–456 V line-to-line, 400 mm² busbar (40 × 10 mm per bar).
  • Ten three-phase outgoing circuits to ten three-phase PDUs — 3 × 32 A, 380–456 V, 1-core 6 mm² per cable.
  • Forty-eight single-phase outgoing circuits to 48 single-phase PDUs — 32 A, 220–264 V line-to-neutral, 1-core 6 mm² per cable.

The bill of materials

Item Function Qty Tier
ATP007kT Centralised display, alarms, basic configuration 1 HMI
AMC100-ZA Both 600 A incomers, breaker status via DI, alarm via DO 1 Main
AKH-0.66/I 600/5 A Incomer current input, 3 per three-phase circuit 6 CT
AMC100-FAK30 Ten three-phase PDU feeders 1 Feeder
AKH-0.66/W-9A + W-9B Branch CTs, split A/B for 10 feeders 15 + 15 CT
AMC100-FAK48 48 single-phase rack branches 1 Rack
AKH-0.66/W-9A + W-9B Branch CTs, one per single-phase circuit 24 + 24 CT

Total: three DIN-rail modules and one 7-inch display for 60 measured circuits. No per-circuit meters, one RS485 chain.

Why the count matters more than the model list

A 48-channel module is not 48 times cheaper than 48 single meters — but it is roughly 48 times less terminal work, 48 fewer addresses to commission, and one place to look when a channel reads zero. The engineering effort moves from wiring to configuration, and configuration is the part that can be copied between halls.

06

Three ways to get the data out

Most projects do not need a new platform — they need the meters to fit the platform that already exists. There are exactly three integration shapes, and the decision between them is a question of who owns the gateway.

Path Topology Uplink What you need from us
A · Local Meters → HMI on RS485. Nothing leaves the room. None Commissioning sheet and alarm list
B · Your gateway Meters → your gateway's RS485 port. Your platform stays as it is. MODBUS-RTU MODBUS register map, device address plan
C · Our gateway Meters → AWT200-1E4S → your platform over 4G, WiFi or Ethernet. MQTT or MODBUS-TCP Protocol file for your integrator; RS485 side is integrated in factory

Choose A when the hall is small, the facility team wants a screen they can walk up to, and IT does not want another IP device on the network. Choose B when a DCIM or BMS already polls the hall and adding a second gateway would duplicate what exists. Choose C when the meters sit in an unmanaged cabinet, or when the platform is cloud-hosted and needs an outbound MQTT connection from the room.

Path C has one practical advantage worth knowing before you design the panel: the RS485 link between the meters and the gateway is configured and verified at the factory, because both ends come from the same product family. That leaves exactly one seam to test on site — the link between the gateway and your platform — instead of two.

Integration topology: meters on RS485, gateway uplink over 4G, WiFi or Ethernet using MQTT or MODBUS-TCP
TopologyPath C in detail. The meter's first RS485 port carries the HMI, the second carries the sub-meter chain, and the third is free for the upstream gateway or a second system.

What the register map actually contains

Per circuit, the useful block is voltage, current, active power, reactive power, power factor, and cumulative import/export energy — plus the status bits from the digital inputs. Because the meters are multi-circuit, the map is channel-indexed: channel 1 through 48 share one register block, offset by channel number. That is what makes a 48-circuit module practical for a DCIM: one device template, 48 channel instances, no per-device engineering.

Alarms without a software project

Over-current, over-voltage, under-voltage and communication-loss alarms can be routed to the digital outputs directly, so a stack light or buzzer responds even if the upstream platform is offline. Treat the digital outputs as the safety layer and the platform alarms as the reporting layer; designing only the latter leaves the room blind during a network outage.

Acrel ATP007kT seven-inch touch screen showing inlet, outlet, switch and alarm screens for a precision power management system
Local layerATP007kT, 7-inch touch screen. Inlet, outlet, switch and alarm screens on one device — the part of the system that keeps working when the uplink does not.
07

Eight checks before you order

Most specification errors on these projects are not electrical — they are counting errors and space errors. Run these eight checks against the single-line diagram before the purchase order goes out.

01
Count channels, not circuits

A three-phase circuit consumes three current channels. Ten three-phase feeders therefore need 30 channels, not ten. Mixing three-phase and single-phase on one module is allowed, but the channel budget is what limits the device.

02
Check the CT aperture against the cable

A 9 mm aperture fits a 1-core 6 mm² branch cable. Busbars, paralleled cables and 25 mm² DC conductors need the larger aperture — and a DC conductor needs a Hall sensor, not a CT.

03
Reserve headroom for the next phase

Buying exactly 48 channels for 48 racks leaves no room for a 49th. One spare module per hall is usually cheaper than a second commissioning visit.

04
Keep the A and B sides symmetrical

If the A feed has channel-level metering and the B feed does not, every comparison between them is an estimate. Redundancy is a property of the pair, so the metering must be too.

05
Budget the auxiliary supply for Hall sensors

Every DC sensor needs ±15 Vdc. One module covers up to 80 sensors; count sensors, not meters, when sizing it.

06
Decide who owns the gateway before ordering

This single decision determines whether you need an AWT200-1E4S, whether the uplink is MQTT or MODBUS-TCP, and which protocol document your integrator will ask for.

07
Plan the digital inputs and outputs

Breaker status on the incomers is a digital input; a local buzzer is a digital output. Both need a pair of wires in the panel schedule, and both are usually forgotten until commissioning.

08
Measure the rail, not the datasheet

Multi-circuit modules are wide. Confirm DIN-rail length and cabinet depth against the actual enclosure, and remember the HMI needs a 7-inch cut-out plus 24 Vdc.

08

Build your scope in 30 seconds

Enter the circuit counts from your single-line diagram. The tool converts them into channel counts, module quantities and the accessory count that follows — the same arithmetic used in section 05.

Scope builder AC + DC · channel-capacity logic from the 2024 guides
Indicative bill of materials
AMC100-ZA · AC main—
AMC100-FAK48 · AC branches—
AKH-0.66 CT · AC current—
AMC100-ZD · DC main—
AMC100-FDK48 · DC branches—
Hall sensors · DC current—
KDYA power module—
AWT200-1E4S gateway—
Measured circuits—

Indicative only: final quantities depend on CT ratio, cable size, spare channels and the number of Hall sensors per supply module (max 80).

09 · Reference project

A switchgear builder in Peru, 48 DC circuits

The customer builds complete DC data center switchgear sets. What they needed was not a monitoring system — it was a metering layer that could live inside their own cabinet, read 48 DC branches at −48 Vdc, show the data locally, and pass it upward to a third-party monitoring platform over Ethernet.

That requirement rules out a packaged cloud solution and points at embedded hardware: a 48-channel DC meter, its Hall sensors, a touch screen doing local display and alarm, and a power module for the sensor supply. The meters were integrated into the customer's switchgear and the combined unit shipped as one product.

The commercial shape is worth noting: the integration is the deliverable, and the value sits in the cabinet rather than in a software subscription. At roughly USD 200,000 project value, the metering layer is a small share of the package. What it changes is the product the customer can put on the market: a switchgear set that arrives already monitored.

Customer
Industria Emalexa S.A.C.
Country
Peru
Scope
48 DC circuits, local HMI, Ethernet uplink
Project value
≈ USD 200,000
Devices
AMC100-FDK48, AHKC Hall sensors, ATP007kT, KDYA module
Integration
Into customer's own switchgear
10 · FAQ

Questions engineers actually ask

How many racks can one multi-circuit meter monitor?

Forty-eight single-phase branches on the 48-channel models, or 16 three-phase branches on the same device, because each three-phase circuit consumes three current channels. The 30-channel model covers ten three-phase or 30 single-phase circuits. In practice, plan one module per PDU group and keep a few spare channels rather than filling every input.

Can I keep my existing DCIM and skip the Acrel gateway?

Yes. The meters expose MODBUS-RTU over RS485, so any gateway or DCIM front-end with an RS485 port can poll them directly. You will need the register map and an address plan; the gateway is only required when the site needs an outbound 4G, WiFi or Ethernet link using MQTT or MODBUS-TCP.

Why can't I use a current transformer on a −48 Vdc branch?

A CT relies on a changing magnetic flux to induce a secondary current. A direct current produces a steady flux, so there is nothing to induce and the CT output is zero. DC branches need a Hall-effect sensor, which measures the flux directly and outputs a proportional ±5 Vdc signal.

What accuracy do I need for tenant billing?

Class 0.2 on the branch current transformers is the practical floor for consumption billed to a tenant, because it keeps the measurement uncertainty well below the commercial margin in a typical contract. Incoming metering on the same site is usually specified to match, so that the sum of branches can be reconciled against the main reading.

How is the system wired when the panel is already full?

The multi-circuit approach is what makes tight panels work: one module, one rail section, one RS485 chain, and CTs that fit behind the breaker. The A and B CT variants exist precisely so that three CTs can be arranged front-to-back without one core sitting on top of another.

Does the local screen still work if the network is down?

Yes. The HMI polls the meters on its own RS485 port, and alarms can be routed to digital outputs that drive a buzzer or stack light. Network loss affects reporting only, not local visibility — which is why the display is specified separately from the uplink.

Can AC and DC metering share one system?

They share the communications layer, not the sensing layer. Both families speak MODBUS-RTU on RS485, so one gateway can poll an AC hall and a DC hall together, and one HMI can display both. The CTs on the AC side and the Hall sensors on the DC side remain separate device families.

Next step

Send us your single-line diagram

We will come back with a channel count, a bill of materials and the MODBUS map for your integrator — including which circuits need a Hall sensor instead of a CT.